Managing the enterprise BOP > Allocating processes or operations to a plant BOP
Allocate processes or operations to a plant BOP
Do one of the following:
Drag the process or operation from the product BOP to the appropriate process area or process in the plant BOP.
Use the Copy and Paste commands.
In the product BOP, do one of the following: Right-click the process or operation that you want to allocate and choose Copy. Select the process or operation that you want to allocate and click Copy . In the plant BOP, do one of the following: Right-click the process area under which you want to allocate the copied process or operation and choose Paste. Select the process area under which you want to allocate the copied process or operation and choose Edit→Paste. Select the process area under which you want to allocate the copied process or operation and click the Paste button .Teamcenter allocates the processes or operations to the process areas and maintains a link between them. If there is a change to the process or operation in the product BOP, you can discover these by performing an accountability check and propagate the change to the plant BOP.
Related Topics
- Propagating changes in compared structures
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/id1674037 · retrieved 2026-07-11