Run a BOM to plant BOP accountability check

You can run an accountability check to compare BOM consumption across multiple plant BOP target assemblies to areas, lines, and stations without using scoped comparison.

Procedure

  1. Open a work package that contains a BOM source and a plant BOP, and navigate to the High Level Planning task page.

  2. In the BOP panel, select a BOP object that has multiple target assemblies.

  3. Right-click the BOP object and choose Process Planning.

  4. On the Process Planning task page, expand the structures and enable the Show Comparison assignment comparison controls.
    The accountability check is executed for all target assemblies. The Target Assemblies tab is populated with blue bars to indicate target assemblies.

  5. In the Target Assemblies tab, click a blue bar to identify and sync to the operation that has the part consumption in the Process panel.