ManufacturingKnowledge

Managing absolute occurrences

Create occurrence groups in a composition

You can create occurrence groups containing absolute occurrences in a composition, as shown in the following figure.

Occurrence groups in a composition

The absolute occurrences for this composition are as follows:

Component Absolute occurrence Parent
Process A1 None
Operation 1 A2 A1
Resource 1 A3 A2
Consumed Item C1 A4 A2
Consumed Item C2 A5 A2
Occurrence group 1 A6 A2
Occurrence for S1 A7 A6
Occurrence for S11 A8 A7
Occurrence for C5 A9 A8
Occurrence group 1 (2) A10 A2
Occurrence for C5 A12 A8

The absolute occurrence of C5 in occurrence group 1 contains a copy of the entire path to the referring occurrence. This is necessary to map this instance of C5 to the corresponding instance in the product. If the path is already copied for another absolute occurrence, it is reused and not recopied.

You can configure a structure in a composition by associating a configurator context with it. You can paste or drag the configurator context onto the referenced structure, and the configurator context object appears as an attachment to the top line of the structure. Alternatively, you can right-click the configurator context and choose Attach Configurator Context to send it to the referenced structure.

Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.plm00043/pmpa0756 · retrieved 2026-07-11