Designing process structure > Creating operations and activities
Create an operation setup structure
Procedure
Create the structure.
View the structure and make any necessary changes.
Allocate workpieces to the setup structure from any product view. Each element in the setup structure can be assigned a type. A workpiece has the type MEWorkpiece.
Allocate work area elements as resources.
Allocate resources from the resource library.
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.pmphelp/create_setup_struct · retrieved 2026-07-11