Managing and tracking changes > Managing incremental changes
Show or hide incremental change management
Using incremental change management is optional. To use it, your administrator must set the Incremental_Change_Management preference to true. When this preference is set to false, the incremental change toolbar is not visible and any loaded items or relationships under incremental change control display in a different color.
You can specify whether incremental change is applied per structure or per application using the MEIncrementalChangeMode preference. If set to structure, incremental change is relevant only for the selected structure and for the secondary views connected to the selected structure. In this mode, each structure can use its own incremental change.
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.mse/pmpa0904 · retrieved 2026-07-11