Reporting > Authoring a process plan without work instructions
Assign parts to an operation without work instructions
If you do not author work instructions, perform this task to create a assign parts to an operation.
Procedure
Open a work package that contains processes and parts.
Navigate to the assembly in which you want to assign parts to an operation.
In the Process panel expand the structure and select the operation.
In the Assembly panel select one part or several parts and drag them to the Parts tab below the Process panel.
What to do next
Tip
To remove an assigned part from an operation, select the operation in the Process panel. In the Parts tab select the part and click Remove .
Source: https://docs.sw.siemens.com/en-US/doc/282219420/PL20251212545240207.xid2214895/xid1974298 · retrieved 2026-07-11